Rath Khala: Chariot making work Day 43-front end was covered with a sal guj and the rear end with a water machine and two sal guj were raised and the kuduka was connected and the work of tying the axles was completed

0
19
Rath Khala: Chariot making work Day 43

By Our Correspondent

PURI:Today, on the 43rd day of the chariot construction, the chariot builders arrived at the chariot yard at 8:00 am and began the construction work after receiving the guidance of the Chief Maharana.

*Chariot construction progress*
(Yesterday, the work of determining the direction with the three-wheeled wheel – the axis of the tower was completed with the help of the three-wheeled chief Maharana, the associate Maharana and the Bhoi Sevaks)
*With appropriate worship, the three-wheeled frame rises to the top of the shaft*
*The three-wheeled wheeling work has ended*
This morning, after the main Maharana performed auspicious puja by beating coconuts on the three chariots, the work of raising the frame of the three chariots on the axles has been completed under the leadership of the associate Maharana Bhoi Sardar Ravi Bhoi with the help of Bhoi servants.
Along with this, the work of rounding the three chariots (half-moon carving or cutting work in the poles) has been completed today. Today, the three chariots can be lifted onto the axle. Under the guidance of the main Maharanas, the supporting Maharanas completed the work of rounding the three chariots, measuring marks and rounding the axles. After that, the three chariots were set with the axle and five front and rear ends were connected. The front end was covered with a sal guj and the rear end with a water machine and two sal guj were raised and the kuduka was connected and the work of tying the axles was completed.
*Tomorrow morning, the work of removing thorns from the three chariot streets will be completed by the Ojha Kamar Sevak*
*With this, the work on the three-wheeler of all the three-wheelers has reached its final stage.
*The art workers have carved three images on the altar throne and three Gandharva images on the chariot’s legs.
*The Maharana who arrived at Dolvedi has continued to make wooden equipment for the service worship method during the Unsar and Rath Yatra.
*The Ojha Sevaks at Dolbedy Kamar Shaal have completed the work of constructing the potal kantra and securing all the kantras to prevent the kantras from falling on the streets three times.
The presence of the charioteer*
*Tiniratha’s Maharana Sevak – 77
*Tiniratha’s servant – 77
*Karti Sevak of the Three Chariots – 4
*The servant of the Three Chariots – 21
*Servant of the Three Chariots Ojha Kamar – 20
*Tumbi Bindha Craftsman – 2
*Pahi Maharana – 2
*Rathakhala Assistant (Panibala) – 1
Total – 204 people